Estimate framed by the
Name of the Work
History.
Scope of Work
Specifications
Carrying out of work
Rates
Time limit
Cost . |
District Officer Buildings, Lahore City. Division No.1 City Dist. Govt. Lahore
Rough Cost Estimate for the construction of Science Teaching Laboratory at Govt. High School, Township, Lahore.
This estimate amounting to Rs. 110, 66,000 has been framed in accordance with the demand of the Edu. Dept. as directed by the Zila Nazim, Lahore. Purpose is to comply with all formalities of new construction. Administrative approval of funds is requested.
Ground floor plinth area 4875 sq ft First floor plinth are 3750 sq ft Second floor plinth area 2355 sq ft Third floor stair mumty 260 sq ft Provision of boundary wall 480 ft Provision of gate and gate pillars 4 jeb Provision for face wall i.e. Gutka 2900 sq ft Provision of lab tables 768 sq ft Provision of 6 electric panels of 100 amp Provision of WAPDA WASA Sui Gas charges Provision of external development charges.
The work shall be done according to the Building Dept.s latest specifications and to the entire satisfaction of the Engineer in charge.
The work shall be executed through approved govt. contractor after competitive tendering.
The plinth area rates have been adopted as circulated by the Chief Engineer, Punjab Buildings Dept. (North Zone) Lahore vide memo no. cw(w)csr-98/50-Dev/1252-55/D(2), dated 19-11-05 with permissible premium and market rates.
It will take about 12 months to complete the work observing all codal formalities.
Total estimated cost Rs. 110,66,000 .. |